Reading starts here
ChurnAtlas

3 time figures to set before an onboarding test runs

Short answer. Lock three timing knobs before reading an onboarding test: the metric delay, the baseline value, and room for the novelty effect to fade.

ChurnAtlas Editorial Team. How posts are made is set out in the editorial standards.

Published · Sources checked · 12 min read

  1. Inputs The order, the outcome the customer agreed to and the people on both sides.
  2. Decision What counts as a first result and who owns each step.
  3. Next action Write the milestone, its owner and its date on the account page.

Three figures lock the timing layer of an onboarding test: the metric delay, the baseline, and the novelty warm-up. Set them from your own data and write them down before traffic enters.

  • Metric delay: the offset between trigger and counted outcome; set it from your session length, and confirm the direction matches whether the outcome can precede the trigger.
  • Baseline: the value the test arm is compared against; prefer a holdback group, then a clean pre-period window, then a rolling average that excludes launch weeks.
  • Novelty warm-up: the slice of early data you collect but don't read; length comes from how long past onboarding changes took to settle in your product.
  • Check the arithmetic: delay + warm-up + read slice must fit inside your planned run length.
  • Do not tune any of the three after you peek — if a setting is wrong mid-run, stop the run and start over.

When you run an onboarding change as a test, you pick the timing before you read a single result. Three figures do most of that work: the metric delay, the baseline you compare against, and the length you leave for novelty to wear off. Set them first, write them down, and your reading stays honest.

GrowthBook's metric documentation covers the metric delay and the novelty effect, with a worked example built on average session length. The quoted passages from GrowthBook, "Metrics and Fact Tables" supply the delay mechanics, the session-length example, the average drift example, and the novelty effect note; the warm-up split, the walk-through, the checklist, and the pre-arm plan are our own workflow guidance.

TL;DR: lock a metric delay that fits your session length, choose a baseline that ignores one-time jumps, and give the cohort enough time for the novelty effect to fade. Do not tune any of the three after you peek.

Who this is for

You lead customer success for a product team. The team hands you an onboarding change to test: a new checklist, a shorter signup path, a nudged first session. You decide when the clock starts, what counts as the conversion window, and when the read is valid. The product team wants the result. You want a result you can defend.

This post assumes you already know how a test arms and splits traffic. The gap most leads hit is not the split. It is the timing layer under the metric. Miss that, and a clean split still produces a number you cannot trust.

Red flags before you start: your average session is short and your delay is long, your baseline contains a launch spike you never trimmed, or you plan to check results daily and cut the run when it looks good. Each one corrupts the read. Skip the run if any of these is unresolved.

The metric delay

Metric delay is the offset the tool applies between when a user triggers the experiment and when the tool counts that user's outcome. The offset can run forward or backward in time. A positive delay waits before counting. A negative delay counts back from the trigger.

The backward case shows up when a conversion can land before the click you care about. GrowthBook notes one example: "For example, a value of -2 would mean conversions up to 2 hours before will be included." That setting suits a flow where the decision happens, then the user loops back to a page the tool flags later.

The forward case suits onboarding where you want the user to sit with the change. If your change needs a settling window before the outcome counts, set a positive delay. The trade-off is data volume. You wait longer for the same cohort to fill.

A negative delay has a real upside. GrowthBook puts it plainly: "If you set the metric delay to something negative, say -0.5 (30 minutes), you can reduce the amount of data you need to see patterns." Half an hour back pulls in conversions that already happened, so the pattern shows sooner.

The right delay starts from your session length, not from a habit. GrowthBook's worked case: "Imagine the average person stays on your site for 60 seconds and your experiment can trigger at any time." That sentence is a starting pattern. Swap your own average in. Swap your own average in. If your onboarding sessions run long, a short delay is fine. If sessions are brief, a long delay outruns the visit.

Two more traps live inside the delay setting. One is a timing edge in the conversion window. A delay window has edges, and a conversion that arrives just outside those edges falls out of the read, for the same reason late conversions are lost. The other is a metric whose delay runs past your planned end date. The last users in the run never get counted, which shortens your effective sample.

Setting the delay for an onboarding flow

Start with the gap between when a user first sees the change and when the outcome you measure can happen. For an onboarding checklist, that gap is the first meaningful session after signup. For a nudged invite flow, the gap can be shorter.

Then check the direction. Ask whether the outcome can precede the trigger. If the user's key action can happen before the tool flags them into the cohort, you need a negative delay so those events still count. If the outcome can only follow the trigger, a positive delay is safe.

Finally, sanity-check against your session data. A delay longer than your typical visit means most users leave before the clock runs. The read will undercount the treatment arm in a way that looks like a real effect.

The baseline you compare against

The second figure is the baseline: the value your test arm is measured against. Onboarding changes often move a metric for reasons that have nothing to do with the change itself. A pricing page refresh, a holiday, a press mention, or a bug fix in an adjacent flow can all shift the number. If your baseline picks that up, the test arm looks better or worse for the wrong reason.

GrowthBook's example shows an average moving from 60 seconds to 65 seconds: "For example, you may see your average go from 60 seconds to 65 seconds." That five-second move can swamp a small onboarding lift, and external events like a pricing refresh or a holiday can push an average the same way. Your job before arming is to pick a baseline window that reflects normal weeks, not the week you happened to launch.

Practical baseline choices, in order of preference:

  • A holdback group that sees the old onboarding. This is the cleanest baseline because it shares the same calendar, same traffic mix, and same external noise as the treatment arm.
  • A pre-period window with the same length as the planned run, drawn from weeks with no known events on your roadmap.
  • A rolling average that excludes your known launch weeks, so one spike does not drag the whole reference line.

Whatever you pick, write the choice into the test plan. If you swap the baseline after results arrive, the read is no longer a test. It is a search for a favorable comparison.

One more baseline note. If your onboarding change targets a metric with natural weekly rhythm — weekends behave differently from weekdays — your baseline window must cover full weeks. A Tuesday-to-Tuesday run against a Monday baseline bakes a weekday effect into your result.

The novelty window

The third figure is the length of the novelty window: how long you wait before you trust that early reactions have settled. Users react to change because it is new. That reaction fades. GrowthBook notes that the novelty effect can be mitigated: "You can mitigate the novelty effect of an experiment; if you are testing a new recommendation algorithm, at first users may react a certain way to the experiment, but eventually they may adjust and so may their behavior."

For an onboarding test, the novelty effect shows up as a spike in engagement in the first days after you ship the change, then a settle. The spike can look like a win. The settle can look like a regression. Neither is the steady-state effect you want to ship.

Two ways to handle the window. First, set a warm-up period at the start of the run where you collect data but do not read it as the result. Second, split the run into a warm-up slice and a read slice, then compare the read slice against your baseline. The warm-up length is your third figure.

How long should the warm-up run? No universal day count applies to onboarding flows. Ask your product analytics lead how long past onboarding changes took to settle in your product, and use that as the warm-up length for this run.

The three figures side by side

Here is a compact view of the three knobs, what each one does, and the signal it changes.

Figure What it controls What it changes in the read
Metric delay When an outcome counts relative to the trigger Which conversions land inside the window
Baseline The value the test arm is compared to Whether external drift shows up as effect
Novelty warm-up How much early data you set aside Whether a first-day spike passes as a win

Fitting the three together

The three figures interact. A long delay plus a short warm-up means your read slice contains mostly late-arriving conversions from users who already saw the change for a while. That can understate novelty and overstate steady state. A short delay plus a long warm-up pulls in early reactions that you then discard, leaving a thin read slice.

Work them in this order. First, fix the delay from your session data. Second, pick the baseline from your roadmap calendar. Third, set the warm-up from your product's settle history. Each figure should be locked and written down before the first user enters the run.

Then check the arithmetic against your traffic. Add the delay to the warm-up to the read slice. If the total exceeds your planned run length, you do not have enough calendar time. Either extend the run, shorten the warm-up, or revisit the delay. Do not fix it by peeking and stopping early.

Two failure modes show up here more than any others. The first is a delay set to a habit rather than your data. Teams copy a setting from a past test and land a delay that outruns their current session length. The second is a warm-up set by gut. Teams declare two days enough because day one looked good. Both produce a read you cannot hand to a stakeholder with a straight face.

A walk-through of one planned run

Suppose you lead CS for a product with short onboarding sessions. Your product team ships a revised checklist. You arm the test Friday and plan a two-week run.

You start from session length. Your typical visit is brief, so a long forward delay would push most outcomes past the visit. You set a delay that sits inside your visit length, then confirm no key conversion lands before the trigger. If it does, you flip the delay negative so those events still count.

You pick the baseline next. The roadmap shows a pricing page refresh mid-month. You choose a holdback arm over the old checklist as your baseline, because it shares the same calendar and the same refresh.

You set the warm-up last. Past onboarding changes in your product took a few days to settle, so you split the run: the first days feed the warm-up slice, and the remainder feeds the read. You note the split in the test plan.

On day three you notice a spike. The warm-up rule keeps you from acting on it. On day eight the spike settles. The read slice compares cleanly against the holdback. You present one number, one baseline, one delay, and the warm-up length. Nothing in the read depended on when you happened to look.

What to write down before you arm

Put these in the test plan, in plain words, before traffic enters:

  • The delay value and the direction, with one sentence on why the direction matches your flow.
  • The baseline choice and the window it covers, with any roadmap events you excluded.
  • The warm-up length and the date the read slice begins.
  • The planned run end date, and a note that delays past the end will not be counted.

If any of those four lines is blank, the run is not ready. Fill them from your own data, then arm the test.

Checklist

Use this as a pre-flight pass the morning you arm the run.

  • Delay set from your session length, not a copied value.
  • Direction confirmed against the order of trigger and outcome.
  • Baseline chosen from a holdback or a clean pre-period.
  • Warm-up length written from your product's settle history.
  • Run length checked against delay plus warm-up plus read slice.
  • Plan filed with all four lines filled, before traffic enters.

Common questions

Can I change the delay mid-run? You can change a setting in a tool. You should not change it mid-run. The read slice was defined against the original delay. A mid-run change makes the first half and the second half count different things. If the delay is wrong, stop the run, fix it, and start over.

What if the spike never settles? A spike that does not fade within your planned warm-up means the change may have a durable effect, or that an external event is riding along. Check your roadmap calendar and any known traffic shifts before you call it. If the calendar is clean, record the result as open: do not extend or redefine the read slice mid-run, and if the timing is still in doubt, plan a new run with a new written plan.

Does the baseline need to match the treatment arm's traffic mix? A holdback arm gets the mix for free, because both arms draw from the same split. A pre-period baseline does not. If your traffic mix shifted during the window, weight the pre-period or use a holdback instead.

How do I handle a change that alters session length itself? If the change moves the very metric your delay depends on, set the delay from the pre-change session data and note that choice. Do not re-derive the delay after results arrive. The delay is a measurement instrument, not a tuning knob.

What if my run hits the planned end date with conversions still in the delay window? Those late conversions will not land in the read. Note the truncation when you present, and plan the next run with a longer calendar or a shorter delay.

Who should sign off on the warm-up length? Your product analytics lead holds the history of how past changes settled. Ask them for that number before you arm, and put their answer in the plan.

Sources

Limits of this post

This post is general operational information, not legal advice about notice periods or renewal clauses. It does not promise that any method keeps a customer. Software can get a fact wrong, so open the sources before you act.