Before you call an onboarding pilot done, check three figures from GrowthBook's power calculator: the weeks it says you need for 80% power, the true lift you assumed, and the power your finished run actually reached.
- the calculator shows weeks needed to reach 80% power, and its example binomial metric needs 3 weeks, so stopping earlier leaves you underpowered
- power is meaningless without the assumed lift: a 34.5% true lift reaches 80% power in 1 week, but a smaller expected lift demands more weeks
- write down the smallest lift worth acting on before the run and use the weeks figure as your end date
- if your run hit significance but power is under 80%, report it as significant-and-underpowered and push for a confirmatory run
- fix the metric, assumed lift, and end date before the pilot starts; avoid peeking and note accounts that join late
What a pilot verdict actually rests on
You are a customer success manager at a software company. You launch a new onboarding path across a handful of customer accounts. After a few weeks, someone asks whether the pilot worked. Your answer should not be a feeling. It should rest on whether the test could have seen a real effect at all.
GrowthBook's power documentation explains the mechanics. Below Analysis Settings is a panel called Calculated Sample Size and Runtime, which shows how many weeks or users you need to reach 80% power by metric ( GrowthBook Docs, "Power"). Power is your chance of detecting a real effect when one exists. At 80% power, if the new onboarding path truly improves the metric by your assumed lift, you would see a statistically significant result four times out of five.
Three figures from that calculator decide whether your pilot result counts: the weeks needed for 80% power, the true lift the calculator assumes, and the power your completed run actually reached. Get those three straight before you declare a verdict.
Figure one: weeks to 80% power
The first figure is the number of weeks the calculator says you need. GrowthBook walks through a binomial metric example: you expect 80% power if you run the experiment for 3 weeks ( GrowthBook Docs, "Power").
Look at the week-by-week column. The highlighted column in week 3 is the first week where at least 80% power is achieved for that metric ( GrowthBook Docs, "Power"). Weeks 1 and 2 sit below the line. A verdict drawn from those weeks is a coin toss dressed up as data.
Read the weeks figure as a floor, not a suggestion. If your pilot ran two weeks and the calculator says three, you stopped early. The result you have is underpowered, and you should say so in your write-up rather than dressing it up.
There is a second way to read the same panel. The calculator reports sample size as users or as weeks, and both describe the same commitment: enough exposure to your new onboarding path that the metric can distinguish a real change from ordinary noise. If your accounts generate activity on a weekly cadence, the weeks figure is the honest planning unit. If you can count individual account-level events precisely, the user figure tells you how many of those you need. Use whichever unit matches how you will actually schedule the pilot, but do not mix them mid-run.
The weeks figure and your calendar
Map the weeks figure onto your calendar before the pilot opens. If the calculator returns three weeks, the earliest honest verdict date is the end of week three. Book the review meeting for after that date, not before.
Keep a written record of the target date you set from the calculator. When a stakeholder asks for an early read, point to that record. The record converts a judgment call into a scheduling fact.
Figure two: the true lift you assumed
The second figure is the lift the calculator was set to. Power is meaningless without it. A pilot that would detect a large jump may still miss a modest improvement, because modest improvements need more data.
GrowthBook shows how sensitive this is. The docs state that if your true lift is 34.5%, after 1 week you will have at least 80% chance of observing a statistically significant result ( GrowthBook Docs, "Power"). The same calculator, pointed at a smaller expected lift, would demand more weeks.
If you are setting priors for a Bayesian view, remember these priors are on the relative scale. A prior mean of 0.1 represents a 10% lift ( GrowthBook Docs, "Power"). Do not read 0.1 as one-tenth of a percent.
Before you run the pilot, write down the smallest lift worth acting on. Feed that into the calculator. The weeks figure you get back is your honest test length. Picking a shorter window because it fits a quarterly review inverts the whole exercise.
| Figure | What the calculator states |
|---|---|
| Power target | 80% power by metric |
| Example weeks to target | 3 weeks for the binomial metric example |
| Example true lift for 1-week significance | 34.5% true lift gives at least 80% chance of a significant result after 1 week |
| Prior scale | Prior mean of 0.1 means a 10% lift (relative scale) |
What if the assumed lift is a guess
In practice the assumed lift comes from past onboarding experiments, a hunch, or a number a stakeholder wants. A high assumed lift buys you a short run and a fragile verdict. A low assumed lift buys a longer run and a sturdier one. Pick deliberately, and say in your summary which lift you assumed.
If the stakeholder who commissioned the pilot will only act on an improvement much larger than your assumption, ask which lift they want powered and get the answer in writing. Their answer sets the weeks figure. Their answer also sets the conversation if the result comes back smaller than expected.
Figure three: the power your run actually reached
The third figure is the power your finished run landed on. GrowthBook addresses the awkward case directly: results came back statistically significant, but the calculator output says power is under 80% ( GrowthBook Docs, "Power").
The docs also note that running an experiment with less than 80% power can still help your organization ( GrowthBook Docs, "Power"). Read that as permission to learn early, not permission to call a final verdict. Use the early read to decide whether to extend the run, kill the variant, or go back and renegotiate the assumed lift.
Reading the achieved power figure honestly
Achieved power answers a specific question: given the lift I assumed and the data I collected, what was my chance of seeing a significant result if that lift were real. When the number sits below the target, the run could not reliably detect the effect you cared about. When the number sits at or above the target, the run had a fair shot, and a non-significant result becomes evidence that the assumed lift did not materialise.
Write the achieved power figure into your summary alongside the point estimate and the confidence interval. Three numbers together tell the story. The point estimate says what you saw. The interval says how wide the uncertainty is. The power figure says how much of that uncertainty the design was built to handle.
How the three figures work together in a real pilot
Take a concrete path. You launch a new onboarding flow for customer accounts. You run it two weeks. Activation looks up. Someone wants a green light.
Open the calculator. Set your metric and your assumed lift. If the output says three weeks for 80% power, you are one week short. Your activation lift may be real, but whether it does depends on the lift you assumed and you cannot yet separate it from noise with confidence.
Now decide. Either extend the pilot one more week, or write up the result as directional with an explicit power caveat. Extending costs time and keeps the variant live in front of customers. Caving early costs credibility the first time the result does not replicate.
If your run already hit significance but power is under 80%, you are in the awkward case above. Report it as significant-and-underpowered. Push for a confirmatory run before you roll the onboarding path to every account.
Setting up the run so the numbers mean something
Power only helps if the test behind it is honest. A few setup habits keep the figures honest.
Fix the metric before you start. Pick the activation event you will judge on. Changing it mid-run because the first one looks bad is how pilots lose their meaning.
Fix the assumed lift before you start. Write down the lift you fed into the calculator. Keep it in the summary you circulate.
Fix the end date from the calculator. The weeks figure sets your stop date. Calendar invitations for a review two days before the calculator's week figure will tempt everyone to call it early.
Watch for peeking. Glancing at the dashboard daily is fine. Declaring a verdict the moment a significance threshold is crossed is not.
Track when accounts enter. Accounts that join the pilot late contribute less data. If half your accounts only show up in the final days, your effective sample is smaller than the headline count.
Talking to stakeholders about an underpowered result
Your stakeholders do not live in this vocabulary. Translate for them.
An underpowered result is not a failed experiment. It is an unfinished one. Say what you ran, what the calculator wanted, and what you recommend: extend, rerun, or accept a directional read with the caveat attached.
If the result is significant and power is under 80%, say both things in the same sentence. Do not lead with significance and bury the power figure. Stakeholders remember the first number they hear.
If the result is not significant and power is low, say the test could not have seen the effect you cared about. Absence of significance under low power is not evidence of no effect.
If the result is not significant and power was high, that is your cleanest negative. The run could have detected the lift you assumed. It did not.
A checklist before you call the pilot done
Run down this list before the verdict email goes out.
- weeks run meets or beats the calculator's figure for 80% power
- assumed lift was written down before the run and matches what you report
- metric was fixed before the run and has not changed
- power of the actual run is stated in the summary, even when significant
- any account that joined late is noted, since it trims the effective sample
- the recommendation names one of three paths: extend, rerun, or accept directional
Next step
Bring up GrowthBook's power calculator today, set the metric you would judge a pilot on, enter the smallest lift worth acting on, and write down the returned weeks figure as your end date before the run starts.
Related guides
FAQ
Does a significant result always mean the pilot worked? No. A significant result from a run below 80% power deserves a confirmatory pass.
Can we stop early if the result looks great? You can stop early to learn, but not to declare a final verdict. Stopping sooner changes the meaning of the significance you saw.
What if the assumed lift is a pure guess? Use your best historical figure and say so in the summary. If the guess is wild, the weeks figure is wild. When the stakeholder who wants the pilot will act on a number much smaller than yours, ask which lift they want powered, and get the answer in writing.
What if we only have one week? Run it and treat the output as a signal. Label the result directional.
If you are choosing a flag system, PostHog describes its Experiment option as creating an A/B test with statistical analysis ( PostHog, "Creating Feature Flags"). The power question stays the same whichever flag system you use.
Sources
Limits of this post
This post is general operational information, not legal advice about notice periods or renewal clauses. It does not promise that any method keeps a customer. Software can get a fact wrong, so open the sources before you act.