Reading starts here
ChurnAtlas

Native and web version floors for a passkey second factor

Short answer. Confirm three native floors, the two web package floors, instance status against the October 19, 2026 cutoff, and the 24-hour opt-out window before kickoff.

ChurnAtlas Editorial Team. How posts are made is set out in the editorial standards.

Published · Sources checked · 15 min read

  1. Inputs The order, the outcome the customer agreed to and the people on both sides.
  2. Decision What counts as a first result and who owns each step.
  3. Next action Write the milestone, its owner and its date on the account page.

Before a passkey second-factor kickoff, confirm the native floors for clerk-ios, clerk-android, and @clerk/expo, and the web floors for @clerk/clerk-js and @clerk/ui. Clerk's sign-up and sign-in options page ties passkey second-factor support to those versions. Then confirm that the customer's Clerk instance already carries the update, which the same page ties to when the instance was created.

Big takeaways

  • Native apps need the three floors listed in the table below, or later, for passkeys as a second factor.
  • Web apps, Expo web included, need both web packages at or above their floors.
  • Instances created on or after October 19, 2026 already have the update, with one exception for certain cloned production instances.
  • After an instance opts in, the customer has 24 hours to reverse the choice.

Native passkey floors for iOS, Android and Expo

Start with the native apps, because each platform has its own SDK and its own version number. Clerk's sign-up and sign-in options page says passkeys are offered as a second factor with "clerk-ios 1.5.0, clerk-android 1.1.4, @clerk/expo 4.13.1, or later." Those three numbers are floors, not exact pins. Any release at or above each number meets the rule. An earlier release does not, no matter how current the rest of the stack looks.

Read each package on its own line. A customer who has upgraded the iOS build but still ships an older Android build has solved only part of the problem. Ask for the version strings from lockfiles or build files rather than from a release memo. Release memos often describe the newest version, and the newest version is not always the one customers actually ship. Teams that keep the mobile build in a separate repository should pull the version from that repository too, because a shared document can drift from what is in the app store.

Expo needs one extra note. The @clerk/expo floor is the native-side number. An Expo app that also runs in a browser falls under the web rules as well, which the next two sections cover. An Expo team therefore tracks two sets of numbers, not one.

For the kickoff itself, use two columns for the native values: the version the customer currently ships, and the person who owns the upgrade. A blank cell on kickoff day is a blocker. A cell that shows a version at or above the floor is closed, and the team can move on to the next item.

Side-by-side floors for each client type

Most kickoff mistakes come from treating every client as one app. A side-by-side table prevents that by listing each client type with its package and its floor. The floors below match the native and web rules described above.

Client type Package to confirm Minimum version
iOS native app clerk-ios 1.5.0 or later
Android native app clerk-android 1.1.4 or later
Expo native app @clerk/expo 4.13.1 or later
Web app @clerk/clerk-js and @clerk/ui 6.40.0 and 1.41.0 or later
Expo web app Web pair (see the row above) 6.40.0 and 1.41.0 or later

Read the table row by row. Each row is a separate pass or fail. A customer with both a mobile build and a web build appears on two rows, which is why the Expo native row and the Expo web row both exist. Treat each row as its own checklist item.

The web rows carry two numbers, not one. Both packages must meet their floors before the row passes, and a team that has upgraded one package but not the other still fails the row. The web section below explains why the two must move together.

Use the table as the kickoff checklist. Copy it into the customer's shared document, add a column for the version each client currently ships, and mark every row pass or fail before the meeting starts. Failing rows should become the first agenda items, because upgrades set the timeline for every later step.

Web app floors for clerk-js and UI

Web teams need the most care, because two packages must move together. The Clerk page says that web apps, including Expo web apps, "need @clerk/clerk-js 6.40.0 and @clerk/ui 1.41.0 or later." Meeting one floor while missing the other fails the web requirement, so both packages should be confirmed before any sign-in tests are scheduled.

Check installed versions, not declared ranges. A package manifest may say something like "any 6.x release," and a fresh install can still resolve to an older build if the lockfile was never updated. Open the lockfile for the deployed branch, find the resolved version of each package, and compare it to the floor. If the lockfile is missing or stale, the team cannot prove compliance from the manifest alone.

Monorepos add a trap. A shared package may pin one version for a marketing site and another for the app, and the wrong workspace can be the one that ships. Name the workspace that serves sign-in, and read the lockfile entry for that workspace specifically.

When a mismatch appears, upgrade both packages in the same change. A single pull request that bumps the two versions together is easier to review and roll back than two separate releases. Ask the engineering lead to name the release that carries both upgrades, so the notes point to one build rather than a moving target.

Upgrades are deploy events, so schedule them before the kickoff rather than during it. Once the new build is live, test one passkey sign-in on a clean browser profile and note the result next to the version numbers. A passing test with the right versions shows the floor is met in production, not only in a development environment.

Instance status and the clone exception

The instance question is separate from the version question, and it is easy to skip. The Clerk options page states: "Instances created on or after October 19, 2026 already have the update, except production instances cloned from a development instance without it." The date is the first figure to note, because it sorts instances into two groups.

Instance situation Already has the update? Cutoff date
Created on or after October 19, 2026 Yes October 19, 2026
Production, cloned from a development instance that lacked the update No, this is the exception October 19, 2026
Production, cloned from a development instance that had the update Yes, because the exception covers only clones without it October 19, 2026

The first row is the simple case. The second row is the exception to watch. A production instance cloned from a development instance that lacks the update does not have it, even though it was created after the date.

The clone exception is the case to watch: a production instance cloned from a development instance without the update does not have it. An instance that looks new may carry the state of its source at the time of the copy, which is why the source deserves attention too.

Ask which instance serves production and how that instance was made. If it was cloned, find out what the source looked like at the time of cloning. That answer decides whether the default applies or the exception catches it. Keep the creation method and date in the notes, next to the client versions.

Keep the instance check separate from the app check. A customer can have fully upgraded native and web clients and still have a production instance that needs attention. Both checks must pass before the kickoff can close as complete.

Opting in and the 24-hour opt-out window

Opting in gives the customer a short, defined window to reverse course. The options page says: "For 24 hours after you opt in, you can opt out on the same page." That sentence sets two facts: the window lasts 24 hours from the moment of opt-in, and the opt-out control sits on the same page where the customer opted in.

Stage Timing Action
Opt in Starts the window Opt in on the sign-up and sign-in options page
Reverse Within the window Opt out from the same screen
Kickoff check Before the window ends Confirm the opt-in state with the customer

Record the exact opt-in time, not just the day. A window that opens in the afternoon closes in the afternoon of the following day. A note that says "opted in yesterday" invites an argument about whether the customer can still reverse, while a timestamp gives both parties the same deadline.

Plan the kickoff around the window. If opt-in happens shortly before the meeting, the customer may want to reverse it during the call. Agree in advance on who may make that decision, and make sure that person is in the meeting. Writing the agreement into the notes protects both the customer and the vendor if questions come up later.

A reversal is a business decision, not a technical fault. Let the customer's owner make it with the facts in front of them, rather than leaving it to whoever happens to be on the call.

Next.js proxy.ts or middleware.ts

Many customer apps built on Next.js include a file that runs before pages render, and its name depends on the framework version. Clerk's Next.js authentication guide gives two rules: "In Next.js 16, Middleware was renamed to Proxy, and the file convention is now proxy.ts." and "If your app is on Next.js 15 or earlier, use middleware.ts instead."

Next.js version File name to expect Naming rule from Clerk
Next.js 16 proxy.ts Middleware was renamed to Proxy
Next.js 15 or earlier middleware.ts Use middleware.ts instead

The file name is a useful cross-check during kickoff. If the repository contains middleware.ts, the team is probably on Next.js 15 or earlier. If it contains proxy.ts, the team is probably on Next.js 16. A file name alone does not prove which version is installed, so the exact version should come from the lockfile.

The quoted rules cover file naming only. Treat it as a setup check rather than a passkey requirement. A customer can pass every package floor and still have the auth file in the wrong place for its framework version, so the kickoff should note the two items separately.

When the file name and the framework version disagree, the fix belongs to engineering. Name the owner of the auth configuration and agree on when they will review the file. The CSM does not need to read the code, but should know which file the team expects to see and where it lives.

Failed client calls during passkey setup

Passkey setup has several moving parts at once: a client package, a web or native build, an instance setting, and a user's device. When one of them is out of date, the failure may appear during the first test rather than during planning. Expect that possibility and plan for it.

Firebase Authentication's blocking functions return an error, and the client operation fails. One Firebase example shows the shape: "Firebase Authentication returns an error, and the client operation fails." ( Firebase blocking functions guide). The lesson carries over. A failed call surfaces as an error on the client, so the error text is the most useful evidence the team has. "Setup didn't work" tells no one anything.

Start by asking the customer to run one passkey setup on a clean test account before the meeting. Capture the error text, the time, the client type, and the version shown in the build. A failed attempt with its version recorded is far more useful than a vague report. It also tells the team which check to run first: the client floor, the web package pair, or the instance update.

Keep the test narrow. Use one client type at a time, so a failure traces back to a single build. Testing an iOS app, an Android app, and a web app in one session makes it hard to tell which client caused the problem. Work through the table rows in order.

Do not treat one failed attempt as proof that passkeys are broken for every user. The first question is whether the failing client meets its floor. Only after the version check passes should the team look at instance status, opt-in state, and the user's devices.

Write the outcome in the kickoff notes as a dated line: what was tested, what failed, and what changed before the retest. Retests should use the same account and client type, so the result can be compared directly with the first attempt.

Where support agents spend their time

A kickoff is not only about the customer's engineers. The support team also needs to know what changes for end users, and the CSM is usually the person who connects those groups. The real question is who will answer when a user asks about passkeys, and how that person will find the information needed to help.

Map the support workflow before the kickoff. Find out who handles first-line sign-in questions, who escalates to engineering, and where those staff members look up account details. An agent who must search several tools to find a user's sign-in method will slow every case. A short, shared reference that lists the current client versions and instance status can cut that search time considerably.

Build the reference from the same items the kickoff uses: the native floors, the web floors, the instance cutoff, and the opt-out window. Assign an owner who updates it after each upgrade. A reference that lags behind the actual build will mislead the people who depend on it most.

Plan a short walkthrough for the support team, not only for engineering. Show them what a successful passkey second-factor sign-in looks like, what the user will see, and which failure cases should go to engineering. Ask them to repeat the steps in their own words, so gaps surface before customers call.

Agree on the escalation path in writing. Name the person who receives a failed setup report, the information they need to act on it, and the time they are expected to respond. The CSM should leave the kickoff knowing exactly who receives the first call.

Which one should you pick?

Customer teams often ask a practical question: should they opt in now, or wait until the instance is confirmed? The answer depends on how the instance was created and on the reversal window, which an earlier section covered.

Instance situation What the page says Recommended path
Created on or after October 19, 2026, not a clone exception Already has the update Confirm the creation date and move on
Production clone of a development instance that lacks the update Does not have the update Plan the opt-in and the window
Created before the cutoff date Not covered by the statement Confirm the creation date and clone history before deciding

For most customers the decision is simple. If the production instance was created on or after October 19, 2026 and is not a clone exception, the team confirms the date and records it. No opt-in decision is needed for that instance.

For the exception, the decision needs more care. Schedule the opt-in for a time when the customer can stay available for the full window, and name the person who may reverse it. An opt-in late in the working day will run into the next day, so the people who need to be present should be told that before the switch is flipped.

For older instances, do not guess. The quoted rules do not describe them, so the CSM should ask the customer to confirm the instance creation date and whether it is a clone of a development instance without the update. That answer then becomes the basis for the decision, rather than an assumption made during the meeting.

Dated kickoff checklist

A checklist works best when each item has a date, an owner, and a pass or fail mark.

The statement on the Clerk options page covers any instance created on or after October 19, 2026, with the clone exception. The steps below turn that rule into dated actions, and each should be completed on the day the kickoff is held.

  • Creation date. Confirm whether the production instance was created on or after October 19, 2026. Owner: customer administrator. Status: pass or fail.
  • Clone history. If the production instance was cloned, confirm whether the source had the update at the time. Owner: customer engineering lead. Status: pass or fail.
  • Native floors. Confirm all three native packages from build files. Owner: mobile lead. Status: pass or fail.
  • Web pair. Confirm both web packages from the lockfile. Owner: web lead. Status: pass or fail.
  • Next.js file. Match proxy.ts or middleware.ts to the framework version. Owner: web lead. Status: pass or fail.
  • Opt-in time. If an opt-in is needed, note the exact time and when the window closes. Owner: customer administrator. Status: pass or fail, or not needed if no opt-in is required.

Bring the checklist to the kickoff with the dates filled in. Any item still marked fail becomes the first agenda item, because it controls the rest of the timeline.

Related guides: App version flags: 3 formats to check before rollout · 7 Apple content rules to check before a customer app review · APP 11 duties for churned customer data.

Reader questions

Do I need all three native versions if the customer only has a web app? No. The native floors apply only to native clients. The options page draws that line clearly, and the web rule covers web apps. Confirm only the rows that match the customer's actual clients.

What counts as a web app for the Expo rule? The Clerk page treats Expo web projects as web apps. An Expo project that runs in a browser therefore falls under the web rule, and also under the native rule if it ships a native build.

Is a higher version acceptable? Yes. The floors are minimums, and each one is "or later," so a customer on a newer release meets the rule. The team should still confirm the version that is actually shipped.

Does clerk-js alone satisfy the web requirement? No. The web rule names two packages, and both must meet their floors for the web row to pass.

Does my instance need the update if I created it recently? Probably not, if it was created on or after October 19, 2026. The page says such instances already have the update, except for the clone exception described above. Check the clone history before you rely on the default.

How long can a customer undo an opt-in? For 24 hours after opting in. Use the exact timestamp from the opt-in so that everyone knows when the window closes.

Can I skip the Next.js file check? The quoted Clerk rules cover file naming only, so treat this as a setup check rather than a version floor. It is still worth checking, because it shows whether the project follows the framework convention for its version. A quick look during kickoff prevents surprises during setup.

Sources

Limits of this post

This post is general operational information, not legal advice about notice periods or renewal clauses. It does not promise that any method keeps a customer. Software can get a fact wrong, so open the sources before you act.